Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Convention and trade show organizers
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ1023 #09 Y:2026 Use steam sparging or injections in place of indirect heating $163,794 $190,000
MZ1023 #08 Y:2026 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $81,881 $665,000
MZ1023 #07 Y:2026 Utilize controls to operate equipment only when needed $1,311 $2,140
MZ1023 #06 Y:2026 Insulate bare equipment $31,375 $16,500
MZ1023 #05 Y:2026 Recover heat from exhausted steam, hot air or hot water $13,206 $54,300
MZ1023 #04 Y:2026 Level zero – install control systems for existing equipment $47,010 $41,600
MZ1023 #03 Y:2026 Make ice during off peak hours for cooling $8,543 $33,000
MZ1023 #02 Y:2026 Install occupancy sensors $8,361 $3,640
MZ1023 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $25,255 $49,072
LT8429 #04 Y:2025 Use solar heat to make electricty $39,608 $674,250
LT8429 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $11,446 $56,400
LT8429 #02 Y:2025 Lower temperature during the winter season and vice-versa $7,830 -
LT8429 #01 Y:2025 Reduce space conditioning during non-working hours $696 -
UU0238 #05 Y:2023 Lower temperature during the winter season and vice-versa $2,731 $5,916
UU0238 #04 Y:2023 Clean condenser tubes $3,894 $3,890
UU0238 #03 Y:2023 Optimize plant power factor $7,670 $22,500
UU0238 #02 Y:2023 Utilize controls to operate equipment only when needed $12,624 $12,621
UU0238 #01 Y:2023 Turn off equipment when not in use $13,223 $4,080
OR0714 #05 Y:2018 Use waste heat from hot flue gases to preheat $1,732 $10,902
OR0714 #04 Y:2018 Size electric motors for peak operating efficiency $6,441 $23,733