ITAC Assessment: UU0238
ITAC logo
ITAC Assessment: UU0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product NA
NAICS 561920: Convention and Trade Show Organizers
SIC 7389: Business Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 40
Plant Area 245,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,732 3,161,100
kWh
Electricity Demand $146,790 10,048
kW-mo/yr
Natural Gas $145,540 16,258
MMBtu
Waste Disposal Costs
Water Usage $7,861 2,826
Tgal
TOTAL YEARLY COSTS $404,923
RECOMMENDED SAVINGS* $40,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,472

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $13,223 $4,080 $1,575
47,737
kWh
- - $11,648
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $12,624 $12,621 $5,757
174,422
kWh
$6,867
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $7,670 $22,500 - - $7,670 -
04 2.2615: Clean condenser tubes $3,894 $3,890 $1,776
53,810
kWh
$2,118
-
kW-mo/yr
- -
05 2.7221: Lower temperature during the winter season and vice-versa $2,731 $5,916 $364
11,029
kWh
$1,613
-
kW-mo/yr
- $754
-
MMBtu
TOTAL RECOMMENDED $40,142 $49,007 $9,472
286,998
kWh
$10,598
-
kW-mo/yr
$7,670 $12,402
-
MMBtu
TOTAL IMPLEMENTED $32,472 $26,507 $9,472
286,998
kWh
$10,598
-
kW-mo/yr
- $12,402
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs