| Assessment Year | 2023 |
|---|---|
| Principal Product | NA |
| NAICS | 561920: Convention and Trade Show Organizers |
| SIC | 7389: Business Services, Not Elsewhere Classified |
| Sales Range | less than $500 k |
| # of Employees | 40 |
| Plant Area |
245,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $104,732 | 3,161,100 |
kWh
|
$0.033 | |
| Electricity Demand | $146,790 | 10,048 |
kW-mo/yr
|
$14.61 | |
| Natural Gas | $145,540 | 16,258 |
MMBtu
|
$8.95 | |
| Waste Disposal Costs | |||||
| Water Usage | $7,861 | 2,826 |
Tgal
|
$2.78 | |
| TOTAL YEARLY COSTS | $404,923 | ||||
| RECOMMENDED SAVINGS* | $40,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $32,472 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $13,223 | $4,080 |
$1,575
47,737
kWh
|
- | - |
$11,648
-
MMBtu
|
|
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $12,624 | $12,621 |
$5,757
174,422
kWh
|
$6,867
-
kW-mo/yr
|
- | - | |
| 03 | 2.3212: Optimize plant power factor | $7,670 | $22,500 | - | - | $7,670 | - | |
| 04 | 2.2615: Clean condenser tubes | $3,894 | $3,890 |
$1,776
53,810
kWh
|
$2,118
-
kW-mo/yr
|
- | - | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $2,731 | $5,916 |
$364
11,029
kWh
|
$1,613
-
kW-mo/yr
|
- |
$754
-
MMBtu
|
|
| TOTAL RECOMMENDED | $40,142 | $49,007 |
$9,472
286,998
kWh
|
$10,598
-
kW-mo/yr
|
$7,670 |
$12,402
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $32,472 | $26,507 |
$9,472
286,998
kWh
|
$10,598
-
kW-mo/yr
|
- |
$12,402
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs