| Assessment Year | 2019 |
|---|---|
| Principal Product | Water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $10 M to 50M |
| # of Employees | 10 |
| Plant Area |
1,605,400
ft2
|
| Annual Production | 2,920,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $118,077 | 1,560,780 |
kWh
|
$0.076 |
| Electricity Demand | $15,592 | 3,898 |
kW-mo/yr
|
$4.00 |
| Electricity Fees | $(-14,823.0) | - |
|
- |
| TOTAL YEARLY COSTS | $118,846 | |||
| RECOMMENDED SAVINGS* | $544,357 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,755 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Usage Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,965 | $24,824 |
$12,965
150,058
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,159 | $11,905 |
$10,159
117,585
kWh
|
- | - | |
| 03 | 3.8121: Cover containers to minimize evaporative losses | $382,131 | $836,063 | - |
$382,131
-
Tgal
|
- | |
| 04 | 2.7423: Reduce heat gain by window tinting | $2,324 | $2,142 |
$2,324
26,895
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $631 | - |
$631
7,305
kWh
|
- | - | |
| 06 | 2.9121: Install wind powered electric generator | $134,851 | $831,480 |
$134,851
1,560,780
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,296 | $270 |
$581
6,728
kWh
|
- | $715 | |
| TOTAL RECOMMENDED | $544,357 | $1,706,684 |
$161,511
1,869,351
kWh
|
$382,131
-
Tgal
|
$715 | ||
| TOTAL IMPLEMENTED | $23,755 | $36,729 |
$23,755
274,948
kWh
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Usage Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs