Assessment Year | 2019 |
---|---|
Principal Product | Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $10 M to 50M |
# of Employees | 10 |
Plant Area |
1,605,400
ft2
|
Annual Production | 2,920,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,077 | 1,560,780 |
kWh
|
$0.076 |
Electricity Demand | $15,592 | 3,898 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $(-14,823.0) | - |
|
- |
TOTAL YEARLY COSTS | $118,846 | |||
RECOMMENDED SAVINGS* | $544,357 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,965 | $24,824 |
$12,965
150,058
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,159 | $11,905 |
$10,159
117,585
kWh
|
- | - | |
03 | 3.8121: Cover containers to minimize evaporative losses | $382,131 | $836,063 | - |
$382,131
-
Tgal
|
- | |
04 | 2.7423: Reduce heat gain by window tinting | $2,324 | $2,142 |
$2,324
26,895
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $631 | - |
$631
7,305
kWh
|
- | - | |
06 | 2.9121: Install wind powered electric generator | $134,851 | $831,480 |
$134,851
1,560,780
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,296 | $270 |
$581
6,728
kWh
|
- | $715 | |
TOTAL RECOMMENDED | $544,357 | $1,706,684 |
$161,511
1,869,351
kWh
|
$382,131
-
Tgal
|
$715 | ||
TOTAL IMPLEMENTED | $23,755 | $36,729 |
$23,755
274,948
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Usage Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs