ITAC Assessment: KU0495
ITAC logo
ITAC Assessment: KU0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product flour
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area
n/a
Annual Production 133,404,300
lb
Production Hrs. Annual 6,384
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,461 4,759,672
kWh
Electricity Demand $65,004 12,939
kW-mo/yr
Natural Gas $14,076 2,583
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $3,700 $4,100 $2,580
118,992
kWh
$1,120
-
kW-mo/yr
- - - - - - -
02 2.7111: Reduce illumination to minimum necessary levels $3,680 $390 $3,650
168,230
kWh
$30
-
kW-mo/yr
- - - - - - -
03 2.4314: Use synthetic lubricant $3,080 $2,650 $1,920
88,218
kWh
$830
-
kW-mo/yr
- - - - - $330 -
04 2.3212: Optimize plant power factor $2,850 $13,260 - $2,300
-
kW-mo/yr
$550 - - - - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,380 $1,490 $1,660
76,202
kWh
$720
-
kW-mo/yr
- - - - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,550 $490 $990
45,721
kWh
$560
-
kW-mo/yr
- - - - - - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $880 $1,000 - - - $880
-
MMBtu
- - - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $6,770 $7,000 - - - - - $7,110
-
lb
$(-340.0) - -
09 3.4155: Meter waste water $850 $100 - - - - $850
-
Tgal
- - - -
10 4.111: Add equipment/ operators to reduce production bottleneck $25,200 $33,030 - - - - - - - - $25,200
11 4.652: Replace existing equipment with more suitable substitutes $22,420 $24,760 $5,710
263,189
kWh
$2,480
-
kW-mo/yr
- - - - $14,230 - -
TOTAL RECOMMENDED $73,360 $88,270 $16,510
760,552
kWh
$8,040
-
kW-mo/yr
$550 $880
-
MMBtu
$850
-
Tgal
$7,110
-
lb
$13,890 $330 $25,200
TOTAL IMPLEMENTED $11,540 $5,120 $8,220
378,371
kWh
$2,140
-
kW-mo/yr
- - $850
-
Tgal
- - $330 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs