ITAC Assessment: ME0260
ITAC logo
ITAC Assessment: ME0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Probes
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 26,500
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,527 155,627
kWh
Electricity Demand $4,364 504
kW-mo/yr
Electricity Fees $693 -
Natural Gas $4,791 617
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $585

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,561 $11,150 $3,269
32,825
kWh
$1,292
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $3,589 $2,480 $4,255
42,497
kWh
$1,868
-
kW-mo/yr
$(-2,534.0)
-
MMBtu
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $2,693 $3,398 $2,693
26,964
kWh
- - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $585 $171 - - $585
-
MMBtu
- -
05 2.8112: Combine utility meters $657 $720 - - - - $657
06 2.8112: Combine utility meters $456 $230 - - - - $456
07 3.4115: Recover and reuse cooling water $352 $350 - - - $352
-
Tgal
-
TOTAL RECOMMENDED $12,893 $18,499 $10,217
102,286
kWh
$3,160
-
kW-mo/yr
$(-1,949.0)
-
MMBtu
$352
-
Tgal
$1,113
TOTAL IMPLEMENTED $585 $171 - - $585
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs