Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Scientific research and development services
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0411 #06 Y:2016 Utilize higher efficiency lamps and/or ballasts $14,579 $45,826
SU0411 #05 Y:2016 Conserve energy by efficient use of vending machines $167 $235
SU0411 #04 Y:2016 Eliminate/reduce an operation $3,627 $6,660
SU0411 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,158 $1,449
SU0411 #02 Y:2016 Reduce ventilation air $3,422 $10,350
SU0411 #01 Y:2016 Use or replace with energy efficient substitutes $2,414 -
WM0054 #08 Y:2014 Minimize water usage $1,764 $6,315
WM0054 #07 Y:2014 Utilize energy-efficient belts and other improved mechanisms $232 $720
WM0054 #06 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,194 $4,048
WM0054 #05 Y:2014 Use solar heat to make electricty $934 -
WM0054 #04 Y:2014 Insulate bare equipment $2,363 $2,000
WM0054 #03 Y:2014 Replace existing chiller with high efficiency model $2,335 $10,000
WM0054 #02 Y:2014 Maintain air filters by cleaning or replacement $1,524 $330
WM0054 #01 Y:2014 Lower temperature during the winter season and vice-versa $8,511 -
UM0421 #03 Y:2013 Re-use or recycle hot or cold process exhaust air $2,857 $4,000
UM0421 #02 Y:2013 Install occupancy sensors $494 $3,525
UM0421 #01 Y:2013 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $75,276 $110,000
SD0378 #07 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,312 $6,160
SD0378 #06 Y:2005 Install occupancy sensors $2,957 $384
SD0378 #05 Y:2005 Use minimum steam operating pressure $1,208 -