ITAC Assessment: SD0378
ITAC logo
ITAC Assessment: SD0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Pharmaceuticals
NAICS 541712: Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
SIC 8731: Commercial Physical and Biological Research
Sales Range less than $500
k
# of Employees 450
Plant Area 350,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $970,069 10,544,904
kWh
Electricity Demand $323,985 21,200
kW-mo/yr
Natural Gas $389,302 46,236
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $231,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $170,338 $792,300 $129,527
1,407,900
kWh
$104,515
-
kW-mo/yr
$(-45,754.0)
-
MMBtu
$(-17,950.0)
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $27,521 - $22,402
243,494
kWh
$5,119
-
kW-mo/yr
- -
03 2.7226: Use computer programs to optimize hvac performance $16,633 - $16,633
180,796
kWh
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $10,124 $15,000 - - $10,124
-
MMBtu
-
05 2.2163: Use minimum steam operating pressure $1,208 - - - $1,208
-
MMBtu
-
06 2.7135: Install occupancy sensors $2,957 $384 $2,957
32,140
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,312 $6,160 $1,533
16,661
kWh
$779
-
kW-mo/yr
- -
TOTAL RECOMMENDED $231,093 $813,844 $173,052
1,880,991
kWh
$110,413
-
kW-mo/yr
$(-34,422.0)
-
MMBtu
$(-17,950.0)
TOTAL IMPLEMENTED $33,234 $21,544 $21,123
229,597
kWh
$779
-
kW-mo/yr
$11,332
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs