ITAC Assessment: UM0421
ITAC logo
ITAC Assessment: UM0421
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fiber Lasers
NAICS 541712: Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
SIC 8711: Engineering Services
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 1,000,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,689 1,831,680
kWh
Natural Gas $10,141 1,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $494

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $75,276 $110,000 - $75,276
-
MMBtu
02 2.7135: Install occupancy sensors $494 $3,525 $494
4,289
kWh
-
03 2.2443: Re-use or recycle hot or cold process exhaust air $2,857 $4,000 - $2,857
-
MMBtu
TOTAL RECOMMENDED $78,627 $117,525 $494
4,289
kWh
$78,133
-
MMBtu
TOTAL IMPLEMENTED $494 $3,525 $494
4,289
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs