ITAC Assessment: WV0022
ITAC logo
ITAC Assessment: WV0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Commercial Indoor and Outdoor Lighting
NAICS
n/a
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 535
Plant Area 320,500
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,991 6,566,530
kWh
Natural Gas $184,874 37,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $973 $12,836 $973
25,791
kWh
-
02 2.4133: Use most efficient type of electric motors $294 $9,520 $294
7,913
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,941 $302 $2,941
22,274
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $8,183 $5,000 - $8,183
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $1,596 $1,125 - $1,596
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $151 - $151
4,103
kWh
-
07 2.2511: Insulate bare equipment $6,078 $1,416 - $6,078
-
MMBtu
TOTAL RECOMMENDED $20,216 $30,199 $4,359
60,081
kWh
$15,857
-
MMBtu
TOTAL IMPLEMENTED $10,073 $15,645 $294
7,913
kWh
$9,779
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs