Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Management, scientific, and technical consulting services
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0088 #06 Y:2026 Install occupancy sensors $1,375 $564
MU0088 #05 Y:2026 Keep doors and windows shut when not on use $25 -
MU0088 #04 Y:2026 Close holes and openings in building such as broken windows $305 $18
MU0088 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $347 $100
MU0088 #02 Y:2026 Install vinyl strip / high speed / air curtain doors $1,192 $452
MU0088 #01 Y:2026 Insulate bare equipment $53,543 $828
CC0022 #04 Y:2023 Use solar heat to make electricty $52,693 $521,729
CC0022 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $6,613 $2,800
CC0022 #02 Y:2023 Keep doors and windows shut when not on use $31,058 $23,000
CC0022 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $30,247 $40,000
DL0205 #09 Y:2022 Utilize a less expensive cooling method $21,960 $20,995
DL0205 #08 Y:2022 Use or replace with energy efficient substitutes $2,193 $3,716
DL0205 #07 Y:2022 Utilize controls to operate equipment only when needed $1,276 $64
DL0205 #06 Y:2022 Improve air circulation with destratification fans / other methods $2,057 -
DL0205 #05 Y:2022 Eliminate/reduce an operation $2,351 -
DL0205 #04 Y:2022 Utilize controls to operate equipment only when needed $15,368 -
DL0205 #03 Y:2022 Turn off equipment when not in use $1,040 -
DL0205 #02 Y:2022 Use computer programs to optimize hvac performance $3,896 -
DL0205 #01 Y:2022 Use computer programs to optimize hvac performance $820 -
DL0204 #08 Y:2022 Reduce space conditioning during non-working hours $6,857 -