ITAC Assessment: CC0022
ITAC logo
ITAC Assessment: CC0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product food distribution
NAICS 541614: Process, Physical Distribution, and Logistics Consulting Services
SIC 4731: Arrangement of Transportation of Freight and Cargo
Sales Range $50
M
to 100
M
# of Employees 265
Plant Area 132,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $332,788 4,444,614
kWh
Electricity Demand $36,791 8,160
kW-mo/yr
Electricity Fees $7,014 -
Natural Gas $52,303 4,837
MMBtu
TOTAL YEARLY COSTS $428,896
RECOMMENDED SAVINGS* $120,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,247 $40,000 $27,947
372,626
kWh
$2,300
-
kW-mo/yr
-
02 2.7442: Keep doors and windows shut when not on use $31,058 $23,000 - - $31,058
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,613 $2,800 $6,110
81,468
kWh
$503
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $52,693 $521,729 $52,693
702,579
kWh
- -
TOTAL RECOMMENDED $120,611 $587,529 $86,750
1,156,673
kWh
$2,803
-
kW-mo/yr
$31,058
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs