ITAC Assessment: DL0205
ITAC logo
ITAC Assessment: DL0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Logistics service provider for restaurant chains
NAICS 541614: Process, Physical Distribution, and Logistics Consulting Services
SIC 4731: Arrangement of Transportation of Freight and Cargo
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 155,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,821 3,646,665
kWh
Electricity Demand $33,330 6,444
kW-mo/yr
Electricity Fees $4,383 -
Natural Gas $23,533 2,810
MMBtu
Waste Disposal Costs
Water Usage $21,179 800
Tgal
TOTAL YEARLY COSTS $272,246
RECOMMENDED SAVINGS* $50,961 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,368

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $820 - $820
13,444
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $3,896 - $3,896
63,867
kWh
-
03 2.6218: Turn off equipment when not in use $1,040 - $203
3,331
kWh
$837
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $15,368 - $15,368
251,936
kWh
-
05 3.1161: Eliminate/reduce an operation $2,351 - $2,351
38,535
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $2,057 - - $2,057
-
MMBtu
07 2.6231: Utilize controls to operate equipment only when needed $1,276 $64 $168
2,762
kWh
$1,108
-
MMBtu
08 2.4322: Use or replace with energy efficient substitutes $2,193 $3,716 - $2,193
-
MMBtu
09 2.2628: Utilize a less expensive cooling method $21,960 $20,995 $21,960
360,000
kWh
-
TOTAL RECOMMENDED $50,961 $24,775 $44,766
733,875
kWh
$6,195
-
MMBtu
TOTAL IMPLEMENTED $15,368 - $15,368
251,936
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs