ITAC Assessment: MZ0305
ITAC logo
ITAC Assessment: MZ0305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product PE and PVC Pipes
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 50,000
ft2
Annual Production 13,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $433,026 8,905,936
kWh
Electricity Demand $368,497 17,032
kW-mo/yr
Natural Gas $110,565 23,008
MMBtu
Waste Disposal Costs
Water Usage $66,457 14,577
Tgal
Water Disposal $53,434 14,577
Tgal
TOTAL YEARLY COSTS $1,031,979
RECOMMENDED SAVINGS* $72,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,475

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.2414: Use waste heat from hot flue gases to preheat $1,825 $9,000 - - $1,825
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,692 $44,928 $24,692
503,971
kWh
- - -
03 2.4133: Use most efficient type of electric motors $27,350 $93,000 $17,041
347,772
kWh
$10,309
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $579 $320 $579
11,842
kWh
- - -
05 3.4116: Meter recycled water (to reduce sewer charges) $16,340 $5,200 - - - $16,340
-
Tgal
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,689 $240 - - $1,689
-
MMBtu
-
TOTAL RECOMMENDED $72,475 $152,688 $42,312
863,585
kWh
$10,309
-
kW-mo/yr
$3,514
-
MMBtu
$16,340
-
Tgal
TOTAL IMPLEMENTED $72,475 $152,688 $42,312
863,585
kWh
$10,309
-
kW-mo/yr
$3,514
-
MMBtu
$16,340
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs