49
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Testing laboratories | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MUCM07 #03 Y:2022 | 03 | 2022 | Minimize water usage | $2,556 | $11,427 | |
MUCM07 #02 Y:2022 | 02 | 2022 | Install occupancy sensors | $693 | $1,199 | |
MUCM07 #01 Y:2022 | 01 | 2022 | Reduce illumination to minimum necessary levels | $1,473 | $3,866 | |
MUCM06 #11 Y:2022 | 11 | 2022 | Install vinyl strip / high speed / air curtain doors | $10,435 | $11,466 | |
MUCM06 #10 Y:2022 | 10 | 2022 | Install vinyl strip / high speed / air curtain doors | $537 | $2,500 | |
MUCM06 #09 Y:2022 | 09 | 2022 | Reduce space conditioning during non-working hours | $20,603 | $58,440 | |
MUCM06 #08 Y:2022 | 08 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,882 | $7,450 | |
MUCM06 #07 Y:2022 | 07 | 2022 | Operate boilers on high fire setting | $1,703 | $450 | |
MUCM06 #06 Y:2022 | 06 | 2022 | Turn off equipment when not in use | $281 | - | |
MUCM06 #05 Y:2022 | 05 | 2022 | Conserve energy by efficient use of vending machines | $981 | $900 | |
MUCM06 #04 Y:2022 | 04 | 2022 | Utilize higher efficiency lamps and/or ballasts | $4,458 | $12,451 | |
MUCM06 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $343 | $934 | |
MUCM06 #02 Y:2022 | 02 | 2022 | Reduce illumination to minimum necessary levels | $8,378 | - | |
MUCM06 #01 Y:2022 | 01 | 2022 | Insulate bare equipment | $419 | $742 | |
MS0398 #03 Y:2022 | 03 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $6,341 | $3,593 | |
MS0398 #02 Y:2022 | 02 | 2022 | Close holes and openings in building such as broken windows | $8,148 | $536 | |
MS0398 #01 Y:2022 | 01 | 2022 | Utilize higher efficiency lamps and/or ballasts | $5,227 | $6,769 | |
MS0395 #04 Y:2022 | 04 | 2022 | Upgrade obsolete equipment | $2,447 | $15,480 | |
MS0395 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $677 | $540 | |
MS0395 #02 Y:2022 | 02 | 2022 | Utilize higher efficiency lamps and/or ballasts | $10,723 | $18,748 |