Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Directory and mailing list publishers
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CO0629 #07 Y:2009 Utilize higher efficiency lamps and/or ballasts $360 $1,450
CO0629 #06 Y:2009 Use solar heat to make electricty $1,260 $3,500
CO0629 #05 Y:2009 Add area lighting switches $1,530 $320
CO0629 #04 Y:2009 Install occupancy sensors $1,940 $1,400
CO0629 #03 Y:2009 Utilize higher efficiency lamps and/or ballasts $13,330 $1,540
CO0629 #02 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $15,160 $1,690
CO0629 #01 Y:2009 Eliminate or reduce compressed air usage $25,070 $9,190
CO0530 #08 Y:2003 Add equipment/ operators to reduce production bottleneck $4,089,000 $4,200,000
CO0530 #07 Y:2003 Install spectral reflectors / delamp $1,200 $570
CO0530 #06 Y:2003 Utilize energy-efficient belts and other improved mechanisms $1,810 $1,250
CO0530 #05 Y:2003 Install occupancy sensors $1,830 $4,140
CO0530 #04 Y:2003 Reduce the pressure of compressed air to the minimum required $2,070 $7,760
CO0530 #03 Y:2003 Upgrade controls on compressors $2,940 $280
CO0530 #02 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $7,370 $230
CO0530 #01 Y:2003 Utilize a less expensive cooling method $13,370 $10,000
SD0329 #05 Y:2003 Use photocell controls $1,360 $1,000
SD0329 #04 Y:2003 Utilize higher efficiency lamps and/or ballasts $4,811 $6,912
SD0329 #03 Y:2003 Utilize controls to operate equipment only when needed $5,587 $320
SD0329 #02 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $11,418 $380
SD0329 #01 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $30,850 $15,600