ITAC Assessment: CO0530
ITAC logo
ITAC Assessment: CO0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Commercial printing (phone books)
NAICS 511140: Directory and Mailing List Publishers
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 30,600,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,373 13,371,000
kWh
Electricity Demand $191,416 25,728
kW-mo/yr
Electricity Fees $420 -
Natural Gas $20,574 5,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,119,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.2628: Utilize a less expensive cooling method $13,370 $10,000 $9,520
365,500
kWh
$3,850
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,370 $230 $5,300
203,200
kWh
$2,070
-
kW-mo/yr
- - -
03 2.4224: Upgrade controls on compressors $2,940 $280 $2,940
112,700
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,070 $7,760 $1,320
50,700
kWh
$750
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $1,830 $4,140 $1,410
54,000
kWh
- $110 $310 -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,810 $1,250 $1,230
47,200
kWh
$580
-
kW-mo/yr
- - -
07 2.7144: Install spectral reflectors / delamp $1,200 $570 $760
29,000
kWh
$300
-
kW-mo/yr
$50 $90 -
08 4.111: Add equipment/ operators to reduce production bottleneck $4,089,000 $4,200,000 - - - - $4,089,000
TOTAL RECOMMENDED $4,119,590 $4,224,230 $22,480
862,300
kWh
$7,550
-
kW-mo/yr
$160 $400 $4,089,000
TOTAL IMPLEMENTED $27,560 $19,520 $20,310
779,300
kWh
$7,250
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs