ITAC Assessment: CO0629
ITAC logo
ITAC Assessment: CO0629
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Telephone directories
NAICS 511140: Directory and Mailing List Publishers
SIC 2741: Miscellaneous Publishing
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 285,000
ft2
Annual Production 75,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $713,176 20,848,510
kWh
Electricity Demand $589,743 38,958
kW-mo/yr
Electricity Fees $1,863 -
Natural Gas $88,569 17,255
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $25,070 $9,190 $15,770
463,000
kWh
$9,300
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,160 $1,690 $9,130
267,900
kWh
$6,030
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,330 $1,540 $5,490
161,200
kWh
$3,630
-
kW-mo/yr
$1,120 - $3,090
04 2.7135: Install occupancy sensors $1,940 $1,400 $1,490
43,700
kWh
- $450 - -
05 2.7131: Add area lighting switches $1,530 $320 $520
15,100
kWh
$640
-
kW-mo/yr
$230 - $140
06 2.9114: Use solar heat to make electricty $1,260 $3,500 $500
14,600
kWh
$760
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $360 $1,450 $120
3,500
kWh
$80
-
kW-mo/yr
$30 $130 -
TOTAL RECOMMENDED $58,650 $19,090 $33,020
969,000
kWh
$20,440
-
kW-mo/yr
$1,830 $130 $3,230
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs