ITAC Assessment: SD0329
ITAC logo
ITAC Assessment: SD0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Printed Material
NAICS 511140: Directory and Mailing List Publishers
SIC 2747:
Sales Range $10
M
to 50
M
# of Employees 79
Plant Area 49,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,732
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,309 1,701,289
kWh
Electricity Demand $70,743 4,501
kW-mo/yr
Natural Gas $4,209 536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,850 $15,600 $22,456
249,787
kWh
$8,394
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,418 $380 $8,705
96,824
kWh
$2,713
-
kW-mo/yr
03 2.6231: Utilize controls to operate equipment only when needed $5,587 $320 $5,587
62,148
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,811 $6,912 $3,664
40,753
kWh
$1,147
-
kW-mo/yr
05 2.7134: Use photocell controls $1,360 $1,000 $605
6,732
kWh
$755
-
kW-mo/yr
TOTAL RECOMMENDED $54,026 $24,212 $41,017
456,244
kWh
$13,009
-
kW-mo/yr
TOTAL IMPLEMENTED $11,418 $380 $8,705
96,824
kWh
$2,713
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs