20
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
CO0629 #07 Y:2009 | 07 | 2009 | Utilize higher efficiency lamps and/or ballasts | $360 | $1,450 | |
CO0629 #06 Y:2009 | 06 | 2009 | Use solar heat to make electricty | $1,260 | $3,500 | |
CO0629 #05 Y:2009 | 05 | 2009 | Add area lighting switches | $1,530 | $320 | |
CO0629 #04 Y:2009 | 04 | 2009 | Install occupancy sensors | $1,940 | $1,400 | |
CO0629 #03 Y:2009 | 03 | 2009 | Utilize higher efficiency lamps and/or ballasts | $13,330 | $1,540 | |
CO0629 #02 Y:2009 | 02 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,160 | $1,690 | |
CO0629 #01 Y:2009 | 01 | 2009 | Eliminate or reduce compressed air usage | $25,070 | $9,190 | |
CO0530 #08 Y:2003 | 08 | 2003 | Add equipment/ operators to reduce production bottleneck | $4,089,000 | $4,200,000 | |
CO0530 #07 Y:2003 | 07 | 2003 | Install spectral reflectors / delamp | $1,200 | $570 | |
CO0530 #06 Y:2003 | 06 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $1,810 | $1,250 | |
CO0530 #05 Y:2003 | 05 | 2003 | Install occupancy sensors | $1,830 | $4,140 | |
CO0530 #04 Y:2003 | 04 | 2003 | Reduce the pressure of compressed air to the minimum required | $2,070 | $7,760 | |
CO0530 #03 Y:2003 | 03 | 2003 | Upgrade controls on compressors | $2,940 | $280 | |
CO0530 #02 Y:2003 | 02 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,370 | $230 | |
CO0530 #01 Y:2003 | 01 | 2003 | Utilize a less expensive cooling method | $13,370 | $10,000 | |
SD0329 #05 Y:2003 | 05 | 2003 | Use photocell controls | $1,360 | $1,000 | |
SD0329 #04 Y:2003 | 04 | 2003 | Utilize higher efficiency lamps and/or ballasts | $4,811 | $6,912 | |
SD0329 #03 Y:2003 | 03 | 2003 | Utilize controls to operate equipment only when needed | $5,587 | $320 | |
SD0329 #02 Y:2003 | 02 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,418 | $380 | |
SD0329 #01 Y:2003 | 01 | 2003 | Use adjustable frequency drive or multiple speed motors on existing system | $30,850 | $15,600 |