6
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
AM0867 #06 Y:2022 | 06 | 2022 | Optimize plant power factor | $23,500 | $87,830 | |
AM0867 #05 Y:2022 | 05 | 2022 | Reschedule plant operations or reduce load to avoid peaks | $34,000 | $10,000 | |
AM0867 #04 Y:2022 | 04 | 2022 | Reduce excessive boiler blowdown | $67,910 | $12,000 | |
AM0867 #03 Y:2022 | 03 | 2022 | Repair or replace steam traps | $109,400 | $10,100 | |
AM0867 #02 Y:2022 | 02 | 2022 | Level zero – install control systems for existing equipment | $263,000 | $452,400 | |
AM0867 #01 Y:2022 | 01 | 2022 | Use waste heat from hot flue gases to preheat incoming fluids | $259,000 | $25,200 |