ITAC Assessment: MZ1020
ITAC logo
ITAC Assessment: MZ1020
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product medical drugs warehousing & shipping
NAICS 493190: Other Warehousing and Storage
SIC 4226: Special Warehousing and Storage, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 47
Plant Area 134,000
ft2
Annual Production 43,750
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,255 622,654
kWh
Natural Gas $30,442 2,350
MMBtu
TOTAL YEARLY COSTS $110,697
RECOMMENDED SAVINGS* $38,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,772 $14,914 $4,917
38,117
kWh
- $1,855
02 2.7135: Install occupancy sensors $11,449 $1,400 $11,449
88,750
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $1,925 $10,800 $1,925
14,923
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $5,827 $3,800 $3,057
23,693
kWh
$2,770
-
MMBtu
-
05 2.7131: Add area lighting switches $44 $120 $44
336
kWh
- -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $12,654 $87,720 $1,406
10,897
kWh
$11,248
-
MMBtu
-
TOTAL RECOMMENDED $38,671 $118,754 $22,798
176,716
kWh
$14,018
-
MMBtu
$1,855
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs