| Assessment Year | 2023 |
|---|---|
| Principal Product | Storage tank terminal facility |
| NAICS | 493190: Other Warehousing and Storage |
| SIC | 4226: Special Warehousing and Storage, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 150 |
| Plant Area |
4,000,000
ft2
|
| Annual Production | 1
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $654,368 | 13,718,120 |
kWh
|
$0.048 |
| Electricity Demand | $274,057 | 51,129 |
kW-mo/yr
|
$5.36 |
| Electricity Fees | $75,306 | - |
|
- |
| Natural Gas | $3,136,415 | 456,405 |
MMBtu
|
$6.87 |
| TOTAL YEARLY COSTS | $4,140,146 | |||
| RECOMMENDED SAVINGS* | $756,810 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $263,000 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $259,000 | $25,200 | - |
$259,000
-
MMBtu
|
- | - | |
| 02 | 4.661: Level zero – install control systems for existing equipment | $263,000 | $452,400 | - | - | - | $263,000 | |
| 03 | 2.2113: Repair or replace steam traps | $109,400 | $10,100 | - |
$109,400
-
MMBtu
|
- | - | |
| 04 | 2.1241: Reduce excessive boiler blowdown | $67,910 | $12,000 | - |
$63,790
-
MMBtu
|
$4,120
-
Tgal
|
- | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $34,000 | $10,000 |
$34,000
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.3212: Optimize plant power factor | $23,500 | $87,830 |
$23,500
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $756,810 | $597,530 |
$57,500
-
kW-mo/yr
|
$432,190
-
MMBtu
|
$4,120
-
Tgal
|
$263,000 | ||
| TOTAL IMPLEMENTED | $263,000 | $452,400 | - | - | - | $263,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs