ITAC Assessment: AM0867
ITAC logo
ITAC Assessment: AM0867
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Storage tank terminal facility
NAICS 493190: Other Warehousing and Storage
SIC 4226: Special Warehousing and Storage, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 4,000,000
ft2
Annual Production 1
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $654,368 13,718,120
kWh
Electricity Demand $274,057 51,129
kW-mo/yr
Electricity Fees $75,306 -
Natural Gas $3,136,415 456,405
MMBtu
TOTAL YEARLY COSTS $4,140,146
RECOMMENDED SAVINGS* $756,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $263,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Water Usage Savings Primary Raw Material Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $259,000 $25,200 - $259,000
-
MMBtu
- -
02 4.661: Level zero – install control systems for existing equipment $263,000 $452,400 - - - $263,000
03 2.2113: Repair or replace steam traps $109,400 $10,100 - $109,400
-
MMBtu
- -
04 2.1241: Reduce excessive boiler blowdown $67,910 $12,000 - $63,790
-
MMBtu
$4,120
-
Tgal
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $34,000 $10,000 $34,000
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $23,500 $87,830 $23,500
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $756,810 $597,530 $57,500
-
kW-mo/yr
$432,190
-
MMBtu
$4,120
-
Tgal
$263,000
TOTAL IMPLEMENTED $263,000 $452,400 - - - $263,000
Yearly Savings* Imp'd Cost* Electricity Demand Savings Natural Gas Savings Water Usage Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs