Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Support activities for transportation
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0679 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $33,723 $25,291
SD0679 #03 Y:2025 Recharge batteries on during off-peak demand periods $10,098 -
SD0679 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $5,125 -
SD0679 #01 Y:2025 Use battery storage for demand control $18,281 $1,472
IP7022 #07 Y:2024 Install occupancy sensors $415 $1,100
IP7022 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $695 $1,653
IP7022 #05 Y:2024 Insulate glazing, walls, ceilings, and roofs $327 $769
IP7022 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,365 $2,993
IP7022 #03 Y:2024 Install compressor air intakes in coolest locations $312 $325
IP7022 #02 Y:2024 Utilize energy-efficient belts and other improved mechanisms $112 $93
IP7022 #01 Y:2024 Reduce space conditioning during non-working hours $11,465 $5,250
AS0557 #07 Y:2023 Install timers on light switches in little used areas $46 $294
AS0557 #06 Y:2023 Minimize water usage $233 $30
AS0557 #05 Y:2023 Use computer programs to optimize hvac performance $333 $284
AS0557 #04 Y:2023 Install occupancy sensors $1,118 $160
AS0557 #03 Y:2023 Use solar heat to make electricty $1,986 $19,728
AS0557 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,169 $2,419
AS0557 #01 Y:2023 Develop standard procedures to improve internal yields $5,610 $960
MS0416 #05 Y:2023 Change rate schedules or other changes in utility service $451 -
MS0416 #04 Y:2023 Utilize daylight whenever possible in lieu of artificial light $2,420 -