ITAC Assessment: LT8447
ITAC logo
ITAC Assessment: LT8447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Transport Services
NAICS 488119: Other Airport Operations
SIC 4581: Airports, Flying Fields, and Airport Terminal Services
Sales Range $1
M
to 5
M
# of Employees 120
Plant Area 65,000
ft2
Annual Production 240,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,837 384,360
kWh
Electricity Demand $7,963 1,069
kW-mo/yr
TOTAL YEARLY COSTS $55,799
RECOMMENDED SAVINGS* $165,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.6218: Turn off equipment when not in use $3,158 $1,147 $2,937
23,607
kWh
$241
-
kW-mo/yr
$(-19.8) -
02 4.426: Modify workload $142,452 $76,494 - - - $142,452
03 2.7135: Install occupancy sensors $3,854 $273 $3,572
28,715
kWh
$281
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,079 $31,131 $12,087
97,166
kWh
$992
-
kW-mo/yr
- -
05 2.7221: Lower temperature during the winter season and vice-versa $2,922 - $2,922
23,487
kWh
- - -
TOTAL RECOMMENDED $165,464 $109,045 $21,518
172,976
kWh
$1,514
-
kW-mo/yr
$(-19.8) $142,452
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs