51
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MUCM33 #10 Y:2025 | 10 | 2025 | Pay bills on time to avoid late fees | $214 | - |
n/a
|
| MUCM33 #09 Y:2025 | 09 | 2025 | Close holes and openings in building such as broken windows | $9,018 | $112 |
n/a
|
| MUCM33 #08 Y:2025 | 08 | 2025 | Install timers and/or thermostats | $463 | $915 |
n/a
|
| MUCM33 #07 Y:2025 | 07 | 2025 | Reduce illumination to minimum necessary levels | $1,846 | - |
n/a
|
| MUCM33 #06 Y:2025 | 06 | 2025 | Turn off equipment when not in use | $253 | - |
n/a
|
| MUCM33 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $168 | - |
n/a
|
| MUCM33 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $17 | - |
n/a
|
| MUCM33 #03 Y:2025 | 03 | 2025 | Install / repair insulation on steam lines | $393 | $457 |
n/a
|
| MUCM33 #02 Y:2025 | 02 | 2025 | Install vinyl strip / high speed / air curtain doors | $5,412 | $17,495 |
n/a
|
| MUCM33 #01 Y:2025 | 01 | 2025 | Use computer programs to optimize hvac performance | $11,904 | $500 |
n/a
|
| MI0467 #08 Y:2025 | 08 | 2025 | Use solar heat to make electricty | $146,758 | $671,919 |
n/a
|
| MI0467 #07 Y:2025 | 07 | 2025 | Replace existing hvac unit with high efficiency model | $26,731 | $46,265 |
n/a
|
| MI0467 #06 Y:2025 | 06 | 2025 | Use photocell controls | $742 | $720 |
n/a
|
| MI0467 #05 Y:2025 | 05 | 2025 | Turn off equipment when not in use | $4,820 | $2,600 |
n/a
|
| MI0467 #04 Y:2025 | 04 | 2025 | Recharge batteries on during off-peak demand periods | $9,626 | $320 |
n/a
|
| MI0467 #03 Y:2025 | 03 | 2025 | Air condition only space necessary | $47,824 | $1,440 |
n/a
|
| MI0467 #02 Y:2025 | 02 | 2025 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $31,123 | $711 |
n/a
|
| MI0467 #01 Y:2025 | 01 | 2025 | Lower temperature during the winter season and vice-versa | $16,554 | - |
n/a
|
| MI0463 #05 Y:2025 | 05 | 2025 | Install partitions to reduce size of conditioned space | $13,397 | $26,570 |
n/a
|
| MI0463 #04 Y:2025 | 04 | 2025 | Turn off equipment during breaks, reduce operating time | $10,085 | $1,600 |
n/a
|