Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0411 #09 Y:2012 Automate payroll system $3,366 $1,500
BD0411 #08 Y:2012 Lease / purchase baler; sell cardboard to recycler $3,915 $5,500
BD0411 #07 Y:2012 Regrind, reuse, or sell scrap plastic parts $54,939 $6,500
BD0411 #06 Y:2012 Install compressor air intakes in coolest locations $487 $650
BD0411 #05 Y:2012 Use synthetic lubricant $541 $350
BD0411 #04 Y:2012 Use power during off-peak periods $845 $10
BD0411 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $1,039 $10
BD0411 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $4,064 $16,570
BD0411 #01 Y:2012 Install occupancy sensors $5,581 $4,200
BD0282 #10 Y:2004 Cool compressor air intake with heat exchanger $212 $450
BD0282 #09 Y:2004 Reduce the pressure of compressed air to the minimum required $544 -
BD0282 #08 Y:2004 Analyze flue gas for proper air/fuel ratio $1,494 $3,200
BD0282 #07 Y:2004 Install occupancy sensors $1,696 $375
BD0282 #06 Y:2004 Analyze flue gas for proper air/fuel ratio $2,439 $3,200
BD0282 #05 Y:2004 Preheat combustion air with waste heat $6,787 $5,000
BD0282 #04 Y:2004 Re-size charging openings or add movable cover or door $6,896 $15,000
BD0282 #03 Y:2004 Utilize higher efficiency lamps and/or ballasts $6,962 $3,545
BD0282 #02 Y:2004 Preheat combustion air with waste heat $7,913 $12,000
BD0282 #01 Y:2004 Use radiant heater for spot heating $14,504 $9,200
BD0281 #09 Y:2004 Minimize water usage $903 $1,320