ITAC Assessment: OK1127
ITAC logo
ITAC Assessment: OK1127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product oilfield equipment, data center modules, & carbon capture systems
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 69,397
ft2
Annual Production 2,000
ton
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,203 1,116,308
kWh
Natural Gas $23,970 5,611
MMBtu
Waste Disposal Costs
Water Usage $2,400 495
Tgal
Water Disposal $5,936 495
Tgal
TOTAL YEARLY COSTS $161,509
RECOMMENDED SAVINGS* $64,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,612 $4,557 $1,612
14,268
kWh
- -
02 2.9114: Use solar heat to make electricty $49,761 $262,800 $49,761
440,363
kWh
- -
03 2.6211: Conserve energy by efficient use of vending machines $1,589 $975 $1,589
14,065
kWh
- -
04 2.7232: Replace existing hvac unit with high efficiency model $565 $3,300 $565
5,000
kWh
- -
05 2.7231: Use radiant heater for spot heating $6,939 $58,500 - $6,939
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $2,477 $5,850 - $2,477
-
MMBtu
-
07 2.3212: Optimize plant power factor $1,583 $11,180 - - $1,583
TOTAL RECOMMENDED $64,526 $347,162 $53,527
473,696
kWh
$9,416
-
MMBtu
$1,583
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs