ITAC Assessment: SU0199
ITAC logo
ITAC Assessment: SU0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Flexible Packaging
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $50
M
to 100
M
# of Employees 129
Plant Area 100,000
ft2
Annual Production 31,500,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $563,243 10,992,289
kWh
Electricity Demand $186,801 23,234
kW-mo/yr
Electricity Fees $31,462 -
Natural Gas $219,931 30,604
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $395,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $378,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $144 - $112
2,202
kWh
$32
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,830 - $3,672
72,000
kWh
$1,158
-
kW-mo/yr
- -
03 4.431: Train operators for maximum operating efficiency $371,280 $13,500 - - - $371,280
04 2.2437: Recover waste heat from equipment $11,792 $1,184 - - $11,792
-
MMBtu
-
05 2.4314: Use synthetic lubricant $7,434 $2,000 $5,649
110,760
kWh
$1,785
-
kW-mo/yr
- -
TOTAL RECOMMENDED $395,480 $16,684 $9,433
184,962
kWh
$2,975
-
kW-mo/yr
$11,792
-
MMBtu
$371,280
TOTAL IMPLEMENTED $378,858 $15,500 $5,761
112,962
kWh
$1,817
-
kW-mo/yr
- $371,280
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs