Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fastener, button, needle, and pin manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0649 #09 Y:2023 Install direct acting units in place of compressed air pressure system in safety system $12,769 $40,200
SD0649 #08 Y:2023 Use waste heat from hot flue gases to preheat $916 $3,000
SD0649 #07 Y:2023 Use most efficient type of electric motors $40,936 $125,410
SD0649 #06 Y:2023 Reschedule plant operations or reduce load to avoid peaks $570,483 -
SD0649 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $52,035 $39,675
SD0649 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $142,164 $183,960
SD0649 #03 Y:2023 Use battery storage for demand control $657,585 -
SD0649 #02 Y:2023 Use solar heat to make electricty $742,364 $1,089,169
SD0649 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $10,802 $16,517
MA0859 #06 Y:2023 Recover waste heat from equipment $28,671 $72,000
MA0859 #05 Y:2023 Recover waste heat from equipment $11,753 $40,550
MA0859 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $13,456 $15,900
MA0859 #03 Y:2023 Recover waste heat from equipment $20,649 $46,300
MA0859 #02 Y:2023 Use solar heat to make electricty $166,304 $1,812,686
MA0859 #01 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,034,369 $4,078,943
MA0825 #05 Y:2021 Minimize water usage $24,897 $6,250
MA0825 #04 Y:2021 Install timers and/or thermostats $35,925 $3,200
MA0825 #03 Y:2021 Recover waste heat from equipment $41,012 $52,945
MA0825 #02 Y:2021 Recover waste heat from equipment $54,067 $150,000
MA0825 #01 Y:2021 Optimize plant power factor $93,702 $30,000