ITAC Assessment: SD0649
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Fasteners
NAICS 339993: Fastener, Button, Needle, and Pin Manufacturing
SIC 3965: Fasteners, Buttons, Needles, and Pins
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 179,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 5,967
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,108,558 10,340,808
kWh
Electricity Demand $777,479 19,296
kW-mo/yr
Electricity Fees $59,503 -
Natural Gas $172,433 35,701
MMBtu
TOTAL YEARLY COSTS $2,117,973
RECOMMENDED SAVINGS* $2,230,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,738

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,802 $16,517 $7,083
66,073
kWh
$3,719
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $742,364 $1,089,169 $295,065
2,752,470
kWh
$447,299
-
kW-mo/yr
-
03 2.3141: Use battery storage for demand control $657,585 - $(-44,227.0)
(-412,560)
kWh
$701,812
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $142,164 $183,960 $73,099
681,891
kWh
$69,065
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,035 $39,675 $29,634
276,431
kWh
$22,401
-
kW-mo/yr
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $570,483 - - $570,483
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $40,936 $125,410 $23,313
217,469
kWh
$17,623
-
kW-mo/yr
-
08 2.2414: Use waste heat from hot flue gases to preheat $916 $3,000 - - $916
-
MMBtu
09 2.4223: Install direct acting units in place of compressed air pressure system in safety system $12,769 $40,200 $12,769
119,111
kWh
- -
TOTAL RECOMMENDED $2,230,054 $1,497,931 $396,736
3,700,885
kWh
$1,832,402
-
kW-mo/yr
$916
-
MMBtu
TOTAL IMPLEMENTED $51,738 $141,927 $30,396
283,542
kWh
$21,342
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs