Assessment Year | 2021 |
---|---|
Principal Product | Hook and Loop Fasteners |
NAICS | 339993: Fastener, Button, Needle, and Pin Manufacturing |
SIC | 3965: Fasteners, Buttons, Needles, and Pins |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
405,000
ft2
|
Annual Production | 15,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $94,833 | 958,833 |
kWh
|
$0.099 | |
Electricity Demand | $285,825 | 33,421 |
kW-mo/yr
|
$8.55 | |
Electricity Fees | $7,600 | - |
|
- | |
Natural Gas | $1,921,200 | 312,278 |
MMBtu
|
$6.15 | |
Waste Disposal Costs | |||||
Water Usage | $55,427 | 25,606 |
Tgal
|
$2.16 | |
Water Disposal | $102,531 | 25,606 |
Tgal
|
$4.00 | |
TOTAL YEARLY COSTS | $2,467,416 | ||||
RECOMMENDED SAVINGS* | $249,603 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $213,678 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $93,702 | $30,000 |
$93,702
-
kW-mo/yr
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $54,067 | $150,000 | - |
$54,067
-
MMBtu
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $41,012 | $52,945 | - |
$12,743
-
MMBtu
|
$9,919
-
Tgal
|
$18,350
-
Tgal
|
|
04 | 2.7261: Install timers and/or thermostats | $35,925 | $3,200 | - |
$35,925
-
MMBtu
|
- | - | |
05 | 3.4151: Minimize water usage | $24,897 | $6,250 | - | - |
$8,736
-
Tgal
|
$16,161
-
Tgal
|
|
TOTAL RECOMMENDED | $249,603 | $242,395 |
$93,702
-
kW-mo/yr
|
$102,735
-
MMBtu
|
$18,655
-
Tgal
|
$34,511
-
Tgal
|
||
TOTAL IMPLEMENTED | $213,678 | $239,195 |
$93,702
-
kW-mo/yr
|
$66,810
-
MMBtu
|
$18,655
-
Tgal
|
$34,511
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs