ITAC Assessment: MA0825
ITAC logo
ITAC Assessment: MA0825
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Hook and Loop Fasteners
NAICS 339993: Fastener, Button, Needle, and Pin Manufacturing
SIC 3965: Fasteners, Buttons, Needles, and Pins
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 405,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,833 958,833
kWh
Electricity Demand $285,825 33,421
kW-mo/yr
Electricity Fees $7,600 -
Natural Gas $1,921,200 312,278
MMBtu
Waste Disposal Costs
Water Usage $55,427 25,606
Tgal
Water Disposal $102,531 25,606
Tgal
TOTAL YEARLY COSTS $2,467,416
RECOMMENDED SAVINGS* $249,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $213,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.3212: Optimize plant power factor $93,702 $30,000 $93,702
-
kW-mo/yr
- - -
02 2.2437: Recover waste heat from equipment $54,067 $150,000 - $54,067
-
MMBtu
- -
03 2.2437: Recover waste heat from equipment $41,012 $52,945 - $12,743
-
MMBtu
$9,919
-
Tgal
$18,350
-
Tgal
04 2.7261: Install timers and/or thermostats $35,925 $3,200 - $35,925
-
MMBtu
- -
05 3.4151: Minimize water usage $24,897 $6,250 - - $8,736
-
Tgal
$16,161
-
Tgal
TOTAL RECOMMENDED $249,603 $242,395 $93,702
-
kW-mo/yr
$102,735
-
MMBtu
$18,655
-
Tgal
$34,511
-
Tgal
TOTAL IMPLEMENTED $213,678 $239,195 $93,702
-
kW-mo/yr
$66,810
-
MMBtu
$18,655
-
Tgal
$34,511
-
Tgal