Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Musical instrument manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0164 #08 Y:2022 Improve air circulation with destratification fans / other methods $489 $2,128
IP0164 #07 Y:2022 Install compressor air intakes in coolest locations $216 $803
IP0164 #06 Y:2022 Recover waste heat from equipment $972 $1,279
IP0164 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,709 $1,228
IP0164 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,851 $1,271
IP0164 #03 Y:2022 Use proper thickness of insulation on building envelope $1,643 $1,028
IP0164 #02 Y:2022 Improve air circulation with destratification fans / other methods $4,853 $2,064
IP0164 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $4,649 $1,428
SD0553 #08 Y:2017 Use most efficient type of electric motors $3,656 $3,225
SD0553 #07 Y:2017 Eliminate or reduce compressed air usage $6,467 $24,570
SD0553 #06 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $6,930 $7,400
SD0553 #05 Y:2017 Reduce the pressure of compressed air to the minimum required $9,604 $600
SD0553 #04 Y:2017 Eliminate or reduce compressed air usage $14,383 $42,185
SD0553 #03 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $17,203 $59,750
SD0553 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $24,252 $39,079
SD0553 #01 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $41,484 $38,000
LL0294 #09 Y:2008 Utilize higher efficiency lamps and/or ballasts $527 $350
LL0294 #08 Y:2008 Install occupancy sensors $645 $90
LL0294 #07 Y:2008 Begin a practice of predictive / preventative maintenance $1,841 $210
LL0294 #06 Y:2008 Eliminate or reduce compressed air usage $2,006 $1,880