Assessment Year | 2008 |
---|---|
Principal Product | Pianos |
NAICS | 339992: Musical Instrument Manufacturing |
SIC | 3931: Musical Instruments |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
280,170
ft2
|
Annual Production | 1,120
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $192,036 | 3,997,600 |
kWh
|
$0.048 |
Electricity Demand | $97,995 | 13,140 |
kW-mo/yr
|
$7.46 |
Natural Gas | $101,143 | 11,348 |
MMBtu
|
$8.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,083 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,542 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $31,560 | $45,800 |
$16,419
333,250
kWh
|
$11,936
-
kW-mo/yr
|
$3,045 |
$160
-
MMBtu
|
- | - | |
02 | 2.3212: Optimize plant power factor | $16,326 | $5,201 | - |
$16,326
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,541 | $10,640 |
$8,619
174,943
kWh
|
- | $922 | - | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $7,897 | $1,210 |
$4,135
83,931
kWh
|
$2,999
-
kW-mo/yr
|
$763 | - | - | - | |
05 | 2.2511: Insulate bare equipment | $4,740 | $2,539 | - | - | - |
$4,740
-
MMBtu
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,006 | $1,880 |
$1,812
36,787
kWh
|
- | $194 | - | - | - | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $1,841 | $210 |
$308
6,250
kWh
|
- | $33 | - | - | $1,500 | |
08 | 2.7135: Install occupancy sensors | $645 | $90 |
$583
11,832
kWh
|
- | $62 | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $527 | $350 |
$164
3,329
kWh
|
$37
-
kW-mo/yr
|
$22 | - | $304 | - | |
TOTAL RECOMMENDED | $75,083 | $67,920 |
$32,040
650,322
kWh
|
$31,298
-
kW-mo/yr
|
$5,041 |
$4,900
-
MMBtu
|
$304 | $1,500 | ||
TOTAL IMPLEMENTED | $8,542 | $1,300 |
$4,718
95,763
kWh
|
$2,999
-
kW-mo/yr
|
$825 | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs