ITAC Assessment: RU0142
ITAC logo
ITAC Assessment: RU0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 8,000
ton
Production Hrs. Annual 4,250
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,284 2,470,692
kWh
Natural Gas $20,690 3,681
MMBtu
Fuel Oil #4 $72,571 15,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,782 - $1,831
20,809
kWh
- $(-49.0)
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,151 - $3,151
35,756
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,812 - - $2,812
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $5,143 - $5,143
55,393
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $222 - $222
2,638
kWh
- -
TOTAL RECOMMENDED $13,110 - $10,347
114,596
kWh
$2,812
-
MMBtu
$(-49.0)
TOTAL IMPLEMENTED $222 - $222
2,638
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs