Assessment Year | 1992 |
---|---|
Principal Product | HEAD GEAR |
NAICS |
n/a
|
SIC | 2353: Hats, Caps, and Millinery |
Sales Range | $10 M to 50M |
# of Employees | 430 |
Plant Area |
n/a
|
Annual Production | 1,600,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,122 | 2,591,735 |
kWh
|
$0.078 |
LPG | $3,199 | 829 |
MMBtu
|
$3.86 |
Fuel Oil #2 | $26,010 | 3,955 |
MMBtu
|
$6.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,461 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,164 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2522: Isolate hot or cold equipment | $8,525 | $1,400 |
$8,525
109,027
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $959 | $1,700 | - |
$959
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,886 | - |
$5,560
71,219
kWh
|
- | $(-674.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $885 | $7,000 |
$885
11,430
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $3,204 | $8,800 |
$3,204
41,032
kWh
|
- | - | |
06 | 2.2511: Insulate bare equipment | $3,153 | $1,113 |
$3,153
40,445
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $898 | $820 |
$898
11,430
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,591 | $20 |
$2,591
33,411
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $1,526 | $200 |
$1,526
19,637
kWh
|
- | - | |
10 | 2.4133: Use most efficient type of electric motors | $238 | $957 |
$238
2,931
kWh
|
- | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $596 | - |
$596
7,620
kWh
|
- | - | |
TOTAL RECOMMENDED | $27,461 | $22,010 |
$27,176
348,182
kWh
|
$959
-
MMBtu
|
$(-674.0) | ||
TOTAL IMPLEMENTED | $16,164 | $18,920 |
$15,205
194,900
kWh
|
$959
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs