ITAC Assessment: TN0240
ITAC logo
ITAC Assessment: TN0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product RR MAINTENANCE EQUIPMENT
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 200,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,715 1,412,954
kWh
Natural Gas $36,222 6,646
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,586

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,237 $180 $9,237
167,937
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $8,060 - $8,060
146,542
kWh
-
03 2.7261: Install timers and/or thermostats $2,349 $300 - $2,349
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,628 - $2,628
47,773
kWh
-
TOTAL RECOMMENDED $22,274 $480 $19,925
362,252
kWh
$2,349
-
MMBtu
TOTAL IMPLEMENTED $11,586 $480 $9,237
167,937
kWh
$2,349
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs