Assessment Year | 1985 |
---|---|
Principal Product | RR MAINTENANCE EQUIPMENT |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 200,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,715 | 1,412,954 |
kWh
|
$0.055 |
Natural Gas | $36,222 | 6,646 |
MMBtu
|
$5.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,274 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,586 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,237 | $180 |
$9,237
167,937
kWh
|
- | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $8,060 | - |
$8,060
146,542
kWh
|
- | |
03 | 2.7261: Install timers and/or thermostats | $2,349 | $300 | - |
$2,349
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,628 | - |
$2,628
47,773
kWh
|
- | |
TOTAL RECOMMENDED | $22,274 | $480 |
$19,925
362,252
kWh
|
$2,349
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,586 | $480 |
$9,237
167,937
kWh
|
$2,349
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs