Assessment Year | 1984 |
---|---|
Principal Product | CONVEYING EQUIPMENT |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,256 | 2,080,012 |
kWh
|
$0.068 |
Natural Gas | $106,907 | 20,783 |
MMBtu
|
$5.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,433 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,847 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $18,055 | $2,514 |
$18,055
264,068
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,440 | $1,100 | - |
$5,340
-
MMBtu
|
$(-900.0) | |
03 | 2.1222: Install turbulators | $2,447 | $2,080 | - |
$2,447
-
MMBtu
|
- | |
04 | 2.2113: Repair or replace steam traps | $3,475 | $1,000 | - |
$3,475
-
MMBtu
|
- | |
05 | 2.7229: Air condition only space necessary | $1,407 | $263 |
$681
9,965
kWh
|
$766
-
MMBtu
|
$(-40.0) | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,004 | $310 |
$2,004
29,308
kWh
|
- | - | |
07 | 2.7261: Install timers and/or thermostats | $2,040 | $200 | - |
$2,040
-
MMBtu
|
- | |
08 | 2.7261: Install timers and/or thermostats | $1,563 | $200 |
$1,563
22,860
kWh
|
- | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,002 | $1,050 | - |
$1,002
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $36,433 | $8,717 |
$22,303
326,201
kWh
|
$15,070
-
MMBtu
|
$(-940.0) | ||
TOTAL IMPLEMENTED | $5,847 | $1,363 |
$681
9,965
kWh
|
$6,106
-
MMBtu
|
$(-940.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs