ITAC Assessment: KU0114
ITAC logo
ITAC Assessment: KU0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CONVEYING EQUIPMENT
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 13,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,256 2,080,012
kWh
Natural Gas $106,907 20,783
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,847

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $18,055 $2,514 $18,055
264,068
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,440 $1,100 - $5,340
-
MMBtu
$(-900.0)
03 2.1222: Install turbulators $2,447 $2,080 - $2,447
-
MMBtu
-
04 2.2113: Repair or replace steam traps $3,475 $1,000 - $3,475
-
MMBtu
-
05 2.7229: Air condition only space necessary $1,407 $263 $681
9,965
kWh
$766
-
MMBtu
$(-40.0)
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,004 $310 $2,004
29,308
kWh
- -
07 2.7261: Install timers and/or thermostats $2,040 $200 - $2,040
-
MMBtu
-
08 2.7261: Install timers and/or thermostats $1,563 $200 $1,563
22,860
kWh
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,002 $1,050 - $1,002
-
MMBtu
-
TOTAL RECOMMENDED $36,433 $8,717 $22,303
326,201
kWh
$15,070
-
MMBtu
$(-940.0)
TOTAL IMPLEMENTED $5,847 $1,363 $681
9,965
kWh
$6,106
-
MMBtu
$(-940.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs