Assessment Year | 2017 |
---|---|
Principal Product | Electric guitars |
NAICS | 339992: Musical Instrument Manufacturing |
SIC | 3931: Musical Instruments |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
166,000
ft2
|
Annual Production | 183,600
units
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,061,154 | 8,552,830 |
kWh
|
$0.12 |
Natural Gas | $300,560 | 62,879 |
MMBtu
|
$4.78 |
TOTAL YEARLY COSTS | $1,361,714 | |||
RECOMMENDED SAVINGS* | $123,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,041 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $41,484 | $38,000 |
$41,484
334,277
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,252 | $39,079 |
$24,252
190,459
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,203 | $59,750 |
$17,203
138,629
kWh
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $14,383 | $42,185 |
$14,383
115,895
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,604 | $600 |
$9,604
77,389
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,930 | $7,400 |
$6,930
55,845
kWh
|
- | |
07 | 2.4239: Eliminate or reduce compressed air usage | $6,467 | $24,570 |
$9,880
79,611
kWh
|
$(-3,413.0) | |
08 | 2.4133: Use most efficient type of electric motors | $3,656 | $3,225 |
$3,656
29,460
kWh
|
- | |
TOTAL RECOMMENDED | $123,979 | $214,809 |
$127,392
1,021,565
kWh
|
$(-3,413.0) | ||
TOTAL IMPLEMENTED | $52,041 | $109,454 |
$52,041
414,393
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs