ITAC Assessment: TN0197
ITAC logo
ITAC Assessment: TN0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SEAT BELT COMPONENTS
NAICS
n/a
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area
n/a
Annual Production 83,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $571,710 12,689,918
kWh
Natural Gas $441,825 96,018
MMBtu
LPG $26,960 3,298
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $1,035 $500 - $1,035
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $910 $500 $910
45,428
kWh
-
03 2.2449: Recover heat from exhausted steam, hot air or hot water $3,170 $15,000 - $3,170
-
MMBtu
04 2.2511: Insulate bare equipment $1,620 $634 - $1,620
-
MMBtu
05 2.2121: Increase amount of condensate returned $10,626 $27,000 - $10,626
-
MMBtu
TOTAL RECOMMENDED $17,361 $43,634 $910
45,428
kWh
$16,451
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs