Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

891

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0227 #04 Y:2024 Eliminate or reduce compressed air usage $727 -
WM0227 #03 Y:2024 Install compressor air intakes in coolest locations $787 $2,103
WM0227 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,869 $2,450
WM0227 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,765 $7,055
OK1127 #07 Y:2024 Optimize plant power factor $1,583 $11,180
OK1127 #06 Y:2024 Install timers and/or thermostats $2,477 $5,850
OK1127 #05 Y:2024 Use radiant heater for spot heating $6,939 $58,500
OK1127 #04 Y:2024 Replace existing hvac unit with high efficiency model $565 $3,300
OK1127 #03 Y:2024 Conserve energy by efficient use of vending machines $1,589 $975
OK1127 #02 Y:2024 Use solar heat to make electricty $49,761 $262,800
OK1127 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,612 $4,557
SD0649 #09 Y:2023 Install direct acting units in place of compressed air pressure system in safety system $12,769 $40,200
SD0649 #08 Y:2023 Use waste heat from hot flue gases to preheat $916 $3,000
SD0649 #07 Y:2023 Use most efficient type of electric motors $40,936 $125,410
SD0649 #06 Y:2023 Reschedule plant operations or reduce load to avoid peaks $570,483 -
SD0649 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $52,035 $39,675
SD0649 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $142,164 $183,960
SD0649 #03 Y:2023 Use battery storage for demand control $657,585 -
SD0649 #02 Y:2023 Use solar heat to make electricty $742,364 $1,089,169
SD0649 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $10,802 $16,517