Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,275

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Medical equipment and supplies manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0447 #06 Y:2025 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $2,030,279 $11,484,200
MS0447 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $144,047 $116,128
MS0447 #04 Y:2025 Replace obsolete burners with more efficient ones $43,724 $145,930
MS0447 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $56,915 $6,958
MS0447 #02 Y:2025 Upgrade obsolete equipment $80,000 $30,005
MS0447 #01 Y:2025 Use solar heat to make electricty $668,474 $6,707,386
OR0806 #05 Y:2025 Adopt in-house material generation $15,683 $76,301
OR0806 #04 Y:2025 Replace existing hvac unit with high efficiency model $1,542 $5,699
OR0806 #03 Y:2025 Insulate bare equipment $3,880 $211
OR0806 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,490 $1,927
OR0806 #01 Y:2025 Use solar heat to make electricty $56,788 $960,069
UD1101 #11 Y:2024 Optimize plant power factor $1,101 $4,400
UD1101 #10 Y:2024 Install occupancy sensors $94 -
UD1101 #09 Y:2024 Reduce illumination to minimum necessary levels $310 $1,350
UD1101 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $430 $1,040
UD1101 #07 Y:2024 Recover waste heat from equipment $2,622 $4,975
UD1101 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,266 $952
UD1101 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $1,284 -
UD1101 #04 Y:2024 Install compressor air intakes in coolest locations $1,619 $1,015
UD1101 #03 Y:2024 Eliminate or reduce compressed air usage $4,750 $7,500