ITAC Assessment: SJ0050
ITAC logo
ITAC Assessment: SJ0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Disposable medical equipment, capital and disposable medical devices, surgical robots
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 76,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,393 871,242
kWh
Electricity Demand $114,935 2,250
kW-mo/yr
Natural Gas $35,236 1,675
MMBtu
TOTAL YEARLY COSTS $301,564
RECOMMENDED SAVINGS* $45,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $420 $619 $156
896
kWh
$264
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $646 - $493
2,835
kWh
$153
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,556 $5,088 $234
1,345
kWh
$1,322
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $16,918 - $2,049
11,775
kWh
- $14,869
-
MMBtu
05 2.9114: Use solar heat to make electricty $26,312 $348,375 $26,312
151,216
kWh
- -
TOTAL RECOMMENDED $45,852 $354,082 $29,244
168,067
kWh
$1,739
-
kW-mo/yr
$14,869
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs