15
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Showcase, partition, shelving, and locker manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
BD0380 #02 Y:2010 | 02 | 2010 | Install smaller boiler (increase high fire duty cycle) | $6,928 | $11 | |
BD0287 #13 Y:2005 | 13 | 2005 | Contract a wood pallet recycling company | $1,040 | $140 | |
BD0287 #12 Y:2005 | 12 | 2005 | Use synthetic lubricant | $564 | $600 | |
BD0287 #10 Y:2005 | 10 | 2005 | Reduce the pressure of compressed air to the minimum required | $658 | - | |
BD0287 #09 Y:2005 | 09 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $894 | $2,500 | |
BD0287 #08 Y:2005 | 08 | 2005 | Recharge batteries on during off-peak demand periods | $146 | - | |
BD0287 #06 Y:2005 | 06 | 2005 | Install / repair insulation on steam lines | $1,900 | $150 | |
BD0287 #05 Y:2005 | 05 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,661 | $225 | |
BD0287 #04 Y:2005 | 04 | 2005 | Recover waste heat from equipment | $4,137 | $1,500 | |
BD0287 #03 Y:2005 | 03 | 2005 | Use radiant heater for spot heating | $9,255 | $19,600 | |
BD0287 #01 Y:2005 | 01 | 2005 | Insulate bare equipment | $13,639 | $248 | |
BD0263 #11 Y:2004 | 11 | 2004 | Sell / offer by-product as animal feed | $26,600 | $130 | |
BD0263 #10 Y:2004 | 10 | 2004 | Utilize higher efficiency lamps and/or ballasts | $421 | $377 | |
BD0263 #09 Y:2004 | 09 | 2004 | Close holes and openings in building such as broken windows | $691 | $1,050 | |
BD0263 #02 Y:2004 | 02 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,939 | $2,400 |