Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0607 #06 Y:2017 Develop a repair/replace policy $1,097 $5,865
NC0607 #05 Y:2017 Recover waste heat from equipment $468 $1,500
NC0607 #04 Y:2017 Eliminate or reduce compressed air usage $3,655 $10,125
NC0607 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $487 $200
NC0607 #02 Y:2017 Reduce illumination to minimum necessary levels $805 $1,000
NC0607 #01 Y:2017 Install occupancy sensors $436 $797
NC0310 #08 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $509 $100
NC0310 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $339 $616
NC0310 #06 Y:2004 Turn off equipment when not in use $1,830 $875
NC0310 #05 Y:2004 Use optimum size and capacity equipment $1,451 $3,000
NC0310 #04 Y:2004 Change rate schedules or other changes in utility service $34,863 $30,000
NC0310 #03 Y:2004 Modify process to reduce material use/cost $60,000 $20,500
NC0310 #02 Y:2004 Develop standard procedures to improve internal yields $97,500 $61,250
NC0310 #01 Y:2004 Optimize lot sizes to reduce inventory carrying costs $167,500 $150,000
NC0307 #07 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,171 $100
NC0307 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $313 $381
NC0307 #05 Y:2004 Utilize energy-efficient belts and other improved mechanisms $1,342 $1,456
NC0307 #04 Y:2004 Recover waste heat from equipment $16,989 $31,278
NC0307 #03 Y:2004 Recycle air for heating, ventilation and air conditioning $32,361 $24,000
NC0307 #02 Y:2004 Develop standard procedures to improve internal yields $72,400 $49,500