| Assessment Year | 2018 |
|---|---|
| Principal Product | Furniture |
| NAICS | 337127: Institutional Furniture Manufacturing |
| SIC | 2521: Wood Office Furniture |
| Sales Range | $50 M to 100M |
| # of Employees | 294 |
| Plant Area |
280,000
ft2
|
| Annual Production | 88,625
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $93,858 | 1,538,651 |
kWh
|
$0.061 |
| Electricity Demand | $33,156 | 7,418 |
kW-mo/yr
|
$4.47 |
| Natural Gas | $77,832 | 5,520 |
MMBtu
|
$14.10 |
| TOTAL YEARLY COSTS | $204,846 | |||
| RECOMMENDED SAVINGS* | $6,948 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,948 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $436 | $797 |
$436
7,644
kWh
|
- | - | - | - | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $805 | $1,000 |
$547
9,600
kWh
|
$258
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $487 | $200 |
$467
8,200
kWh
|
$220
-
kW-mo/yr
|
- | $(-100.0) | $(-100.0) | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $3,655 | $10,125 |
$3,655
64,125
kWh
|
- | - | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $468 | $1,500 | - | - |
$468
-
MMBtu
|
- | - | |
| 06 | 2.4151: Develop a repair/replace policy | $1,097 | $5,865 |
$746
13,086
kWh
|
$351
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $6,948 | $19,487 |
$5,851
102,655
kWh
|
$829
-
kW-mo/yr
|
$468
-
MMBtu
|
$(-100.0) | $(-100.0) | ||
| TOTAL IMPLEMENTED | $6,948 | $19,487 |
$5,851
102,655
kWh
|
$829
-
kW-mo/yr
|
$468
-
MMBtu
|
$(-100.0) | $(-100.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs