Assessment Year | 2015 |
---|---|
Principal Product | Plastic Molding |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
84,000
ft2
|
Annual Production | 140,000,000
pieces
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $325,887 | 4,724,400 |
kWh
|
$0.069 |
Electricity Demand | $148,448 | 10,138 |
kW-mo/yr
|
$14.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,894 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,988 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,465 | $3 |
$3,859
55,937
kWh
|
$1,606
-
kW-mo/yr
|
|
02 | 2.4323: Use optimum size and capacity equipment | $2,351 | - |
$524
7,595
kWh
|
$1,827
-
kW-mo/yr
|
|
03 | 2.6218: Turn off equipment when not in use | $1,460 | $3 |
$1,460
21,162
kWh
|
- | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,413 | $3 |
$998
14,475
kWh
|
$415
-
kW-mo/yr
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,177 | $86 |
$4,177
60,560
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,460 | $1,880 |
$1,031
14,945
kWh
|
$429
-
kW-mo/yr
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $568 | $1,146 |
$401
5,814
kWh
|
$167
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $16,894 | $3,121 |
$12,450
180,488
kWh
|
$4,444
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $7,988 | $89 |
$6,161
89,317
kWh
|
$1,827
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs