ITAC Assessment: IC0068
ITAC logo
ITAC Assessment: IC0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Printed Circuit Boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 35,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 1,632
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,336 1,024,560
kWh
Electricity Demand $56,650 4,656
kW-mo/yr
Electricity Fees $4,625 -
Natural Gas $14,868 2,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,412 - $838
20,950
kWh
$574
-
kW-mo/yr
- - -
02 2.7261: Install timers and/or thermostats $3,197 $855 - - $3,197
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,566 $12,133 $748
18,682
kWh
$1,605
-
kW-mo/yr
- $22 $191
04 2.7135: Install occupancy sensors $717 $2,397 $504
12,535
kWh
$213
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $701 $1,279 $155
3,855
kWh
$65
-
kW-mo/yr
- $269 $212
06 2.4321: Upgrade obsolete equipment $84 $179 $26
647
kWh
$58
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $919 $5,605 $295
7,380
kWh
$661
-
kW-mo/yr
- $(-26.0) $(-11.0)
TOTAL RECOMMENDED $9,596 $22,448 $2,566
64,049
kWh
$3,176
-
kW-mo/yr
$3,197
-
MMBtu
$265 $392
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs