Assessment Year | 2003 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS | 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
35,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 1,632
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $36,336 | 1,024,560 |
kWh
|
$0.035 |
Electricity Demand | $56,650 | 4,656 |
kW-mo/yr
|
$12.17 |
Electricity Fees | $4,625 | - |
|
- |
Natural Gas | $14,868 | 2,199 |
MMBtu
|
$6.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,596 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,412 | - |
$838
20,950
kWh
|
$574
-
kW-mo/yr
|
- | - | - | |
02 | 2.7261: Install timers and/or thermostats | $3,197 | $855 | - | - |
$3,197
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,566 | $12,133 |
$748
18,682
kWh
|
$1,605
-
kW-mo/yr
|
- | $22 | $191 | |
04 | 2.7135: Install occupancy sensors | $717 | $2,397 |
$504
12,535
kWh
|
$213
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $701 | $1,279 |
$155
3,855
kWh
|
$65
-
kW-mo/yr
|
- | $269 | $212 | |
06 | 2.4321: Upgrade obsolete equipment | $84 | $179 |
$26
647
kWh
|
$58
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $919 | $5,605 |
$295
7,380
kWh
|
$661
-
kW-mo/yr
|
- | $(-26.0) | $(-11.0) | |
TOTAL RECOMMENDED | $9,596 | $22,448 |
$2,566
64,049
kWh
|
$3,176
-
kW-mo/yr
|
$3,197
-
MMBtu
|
$265 | $392 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs