Assessment Year | 2013 |
---|---|
Principal Product | Lasers and Optics |
NAICS | 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing |
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
139,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,510
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,025,373 | 9,647,886 |
kWh
|
$0.11 |
Natural Gas | $99,314 | 14,120 |
MMBtu
|
$7.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,461 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,979 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,719 | - |
$1,719
16,171
kWh
|
|
02 | 2.6218: Turn off equipment when not in use | $1,686 | - |
$1,686
15,863
kWh
|
|
03 | 2.6231: Utilize controls to operate equipment only when needed | $8,403 | $649 |
$8,403
79,052
kWh
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,301 | $7,526 |
$9,301
87,499
kWh
|
|
05 | 2.7135: Install occupancy sensors | $373 | $1,619 |
$373
3,510
kWh
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,979 | $17,191 |
$3,979
37,432
kWh
|
|
TOTAL RECOMMENDED | $25,461 | $26,985 |
$25,461
239,527
kWh
|
||
TOTAL IMPLEMENTED | $3,979 | $17,191 |
$3,979
37,432
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs