ITAC Assessment: SF0426
ITAC logo
ITAC Assessment: SF0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Lasers and Optics
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 139,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,510
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,025,373 9,647,886
kWh
Natural Gas $99,314 14,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,979

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,719 - $1,719
16,171
kWh
02 2.6218: Turn off equipment when not in use $1,686 - $1,686
15,863
kWh
03 2.6231: Utilize controls to operate equipment only when needed $8,403 $649 $8,403
79,052
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,301 $7,526 $9,301
87,499
kWh
05 2.7135: Install occupancy sensors $373 $1,619 $373
3,510
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,979 $17,191 $3,979
37,432
kWh
TOTAL RECOMMENDED $25,461 $26,985 $25,461
239,527
kWh
TOTAL IMPLEMENTED $3,979 $17,191 $3,979
37,432
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs