ITAC Assessment: UA0166
ITAC logo
ITAC Assessment: UA0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Medical Care
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 100,000
ft2
Annual Production 5,450
units
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $426,150 4,394,759
kWh
Electricity Demand $12,552 11,381
kW-mo/yr
Electricity Fees $21,225 -
Natural Gas $130,213 23,534
MMBtu
TOTAL YEARLY COSTS $590,140
RECOMMENDED SAVINGS* $191,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,482

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $93,758 $199,325 $49,417
509,611
kWh
- $870 $43,471
-
MMBtu
02 2.7233: Use properly designed and sized hvac equipment $25,491 $80 $25,050
258,332
kWh
- $441 -
03 2.2625: Chill water to the highest temperature possible $26,248 $80 $25,794
266,002
kWh
- $454 -
04 2.7241: Install outside air damper / economizer on hvac unit $14,642 $59,120 $14,389
148,388
kWh
- $253 -
05 2.2625: Chill water to the highest temperature possible $1,707 $120 $1,677
17,291
kWh
- $30 -
06 2.7224: Reduce space conditioning during non-working hours $617 $200 $280
2,890
kWh
- $5 $332
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $25,666 $38,071 $24,768
255,424
kWh
$454
-
kW-mo/yr
$444 -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,753 $1,050 $3,639
37,525
kWh
$49
-
kW-mo/yr
$65 -
TOTAL RECOMMENDED $191,882 $298,046 $145,014
1,495,463
kWh
$503
-
kW-mo/yr
$2,562 $43,803
-
MMBtu
TOTAL IMPLEMENTED $83,482 $39,601 $81,208
837,464
kWh
$503
-
kW-mo/yr
$1,439 $332
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs