ITAC Assessment: SJ0009
ITAC logo
ITAC Assessment: SJ0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Weldments for semiconductor industry
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 44,365
ft2
Annual Production 140,000
units
Production Hrs. Annual 4,550
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,518 370,796
kWh
Electricity Demand $20,814 1,596
kW-mo/yr
Natural Gas $12,690 587
MMBtu
TOTAL YEARLY COSTS $119,022
RECOMMENDED SAVINGS* $95,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $67,746 $441,525 $65,883
285,203
kWh
$1,863
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,869 $18,228 $13,631
59,103
kWh
$2,238
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,699 $844 $1,699
7,366
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $764 $32 $764
3,311
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $6,705 - - - $6,705
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $469 - $469
2,032
kWh
- -
07 2.2511: Insulate bare equipment $8 $200 $8
33
kWh
- -
08 2.4133: Use most efficient type of electric motors $513 $624 $476
2,065
kWh
$37
-
kW-mo/yr
-
09 2.6212: Turn off equipment during breaks, reduce operating time $1,761 $2,675 $1,761
7,635
kWh
- -
10 2.6127: Maintain air filters by cleaning or replacement $147 $50 $147
636
kWh
- -
TOTAL RECOMMENDED $95,681 $464,178 $84,838
367,384
kWh
$4,138
-
kW-mo/yr
$6,705
-
MMBtu
TOTAL IMPLEMENTED $9,836 $1,750 $3,094
13,411
kWh
$37
-
kW-mo/yr
$6,705
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings